Renovating This Low Traffic Pathway
Renovating this low traffic pathway for a customer in Ossett Wakefield – Mrs. Cliff wanted to match up the front and side path to her property, Laying over an existing tired looking concrete path with 25mm of resin bound.
To the front of the house it already had flags down so we cut out and filled in with some decorative key stones and then filled in with the non slip resin to make it look like it had always been there. This whole project took 4 days in total from start to finish.
To the front of the house it already had flags down so we cut out and filled in with some decorative key stones and then filled in with the non slip resin to make it look like it had always been there. This whole project took 4 days in total from start to finish.